Sundland Maintenance Facility

Photo of Sundland Maintenance Facility

Sundland Maintenance Facility Photo: Ove Vedvik

On this page:

Facility Location

Contact Information

Track Table and Facilities

Track Power Supply Facilities and Services  Other
No. Length (m) Catenary Number on disconnector Length of pit (m) Lifting facilities Access to roof control Bridge crane Thawing/Drying Toilet waste disposal Water filling 400V test power 1000V train pre-heating installations Comments
J1 200   -   X   X       X X The bridge crane has a capacity of  2x20 tonnes.
J2 200   - 90 X   X       X X The bridge crane has a capacity of  2x20 tonnes.
J3 200   -   X   X       X X The bridge crane has a capacity of  2x20 tonnes.
N1 234 X Z-201 (N1 East), Z-117 (N1 West) 220 X X X X X X X X The bridge crane has a capacity of  1x16 tonnes.
N2 234 X Z-202 (N2 East), Z-116 (N2 West) 220   X X X X X X X

The bridge crane has a capacity of  1x16 tonnes.

Bridge crane N2 east and N2 west with a capacity of 1500 kg.  

I1 71 X Z-462               X   Wheel lathe.
I2 114 X Z-463 85         X X     Train washing machine.
I3 93 X Z-464 85   X              
I4 93 X Z-465 85   X         X    
I5 108   - 90     X       X   Bridge crane west with a capacity of 2x16 tonnes on track 5 and 6. 
I6 108   - 90     X       X   Bridge crane east with a capacity of 2x10 tonneson track 5 and 6. 

Track Plan

Track plan for Sundland Maintenance Facility, valid from September 2024.

Track plan for Sundland Maintenance Facility is valid from September 2024. Bane NOR

Download the track plan

Track plan is valid from September 2024.

About the Facility

For more information about Sundland Maintenance Facility, please get in touch with the contact person.