Grorud Maintenance Facility

Photo of Grorud Maintenance Facility

Grorud Maintenance Facility Photo: Terje Borud

On this page:

Facility Location

Contact Information

Track Table and Facilities

Track Power Supply Facilities and Services  Other
No. Length (m) Catenary Number on disconnector Length of pit (m) Lifting facilities Access to roof control Bridge crane Thawing/Drying Toilet waste disposal Water filling 400V test power 1000V train pre-heating installations Comments
0 South 41 X Z-28, Z134 39   X X            
1 South 119 X Z-135, Z-136, Z-132 Wing E: 40 

Wing F: 40
    X           Through track.
4 South 107     19                 Through track with washing bay.
13 South 110     110 X             X  
14 South 110                     X  
2 North 62 X   52 X   X            
3 North 52     52 X   X            
3A North 50     30 X   X            
5 North 10           X            
6 North 9           X            
7 North 14           X            
10 North 33     22     X            
11 North 188           X           Through track.
12 North 110     21+19     X           Washing bay measuring 26 metres.
13 North 110     22+19 X   X           Washing bay measuring 26 metres.
14 Nord 110     51+26 X   X            
15 Nord 110     51+23     X            

Track Plan

The facility is currently under construction; a new schematic track plan will be made available when construction is concluded. 

About the Facility

For more information about Grorud Maintenance Facility, get in touch with the contact person.