Sundland Maintenance Facility
On this page:
Facility Location
Contact Information
Hans Inge Fuglseth
Telephone
Track Table and Facilities
Track | Power Supply | Facilities and Services | Other | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No. | Length (m) | Catenary | Number on disconnector | Length of pit (m) | Lifting facilities | Access to roof control | Bridge crane | Thawing/Drying | Toilet waste disposal | Water filling | 400V test power | 1000V train pre-heating installations | Comments |
J1 | 200 | - | X | X | X | X | The bridge crane has a capacity of 2x20 tonnes. | ||||||
J2 | 200 | - | 90 | X | X | X | X | The bridge crane has a capacity of 2x20 tonnes. | |||||
J3 | 200 | - | X | X | X | X | The bridge crane has a capacity of 2x20 tonnes. | ||||||
N1 | 234 | X | Z-201 (N1 East), Z-117 (N1 West) | 220 | X | X | X | X | X | X | X | X | The bridge crane has a capacity of 1x16 tonnes. |
N2 | 234 | X | Z-202 (N2 East), Z-116 (N2 West) | 220 | X | X | X | X | X | X | X |
The bridge crane has a capacity of 1x16 tonnes. Bridge crane N2 east and N2 west with a capacity of 1500 kg. |
|
I1 | 71 | X | Z-462 | X | Wheel lathe. | ||||||||
I2 | 114 | X | Z-463 | 85 | X | X | Train washing machine. | ||||||
I3 | 93 | X | Z-464 | 85 | X | ||||||||
I4 | 93 | X | Z-465 | 85 | X | X | |||||||
I5 | 108 | - | 90 | X | X | Bridge crane west with a capacity of 2x16 tonnes on track 5 and 6. | |||||||
I6 | 108 | - | 90 | X | X | Bridge crane east with a capacity of 2x10 tonneson track 5 and 6. |
Track Plan
Download the track plan
Track plan is valid from September 2024.
About the Facility
For more information about Sundland Maintenance Facility, please get in touch with the contact person.